Location: Home > Terminology Library  

break-before-make banner

break-before-make

By default, the pole of the BBM (break-before-make, break before make) SPDT switch is connected to NO throw circuit and disconnected from the NC throw circuit. When the break-before-make switch is switched, it will first disconnect to the NO circuit, and then connect to the NC circuit.



  Get in touch with us now!


Please take a minute or two to complete this simple form to get reply in 24 hours, thank you!

*Please check the trash box of your mailbox, if you do not receive our email.